A Batavia commercial pavement scope should treat recurring water, settlement and edge failure as design clues. Replacing the surface without understanding where runoff goes can reproduce the same failure at a new elevation.
Drainage-led repair planning
Trace low areas, inlet condition, surface flow and adjacent grades before choosing a repair. A basin reset, localized base repair, resurfacing or broader grading correction solve different problems and should not be priced as interchangeable work.
Plan the work around the operating property
Plan drainage and underground work before milling or paving. Protect inlets from debris, keep active entrances usable and state how finished elevations will tie into doors, sidewalks and neighboring pavement.
Questions the Batavia scope should answer
- Map ponding after rain and distinguish it from short-term surface wetness.
- Inspect inlet frames, collars and pavement settlement.
- Identify utility cuts and recurring patch boundaries.
- Confirm who controls connected drainage structures.
- Show proposed tie-in elevations and access impacts in the scope.
Related commercial paving decisions
- catch basin repair
- parking lot drainage solutions
- commercial asphalt repair
- Kane County commercial paving
Confirm the project jurisdiction before construction
The property address and exact work determine whether municipal, county, accessibility, drainage, right-of-way or other review applies. Do not assume that calling work “maintenance” settles the permit question. Start with Kane County Stormwater Management Ordinance, then confirm the current project-specific path with the municipality or authority having jurisdiction.
Request a commercial pavement site review
Paving permits and parking-plan review in Batavia
Batavia’s grading permit rule is separate from ordinary pavement maintenance. Where reconstruction changes the ground, the lot size, stormwater setting and approved grading plans matter to the permit decision.
We handle permits and inspections
Windy City Paving handles the entire permit process for your project: determining whether permits are required, preparing and submitting the applications, and obtaining the required permits. We coordinate and attend all required inspections with city or village officials, including inspections during construction and final inspections at project completion. We will identify any owner signatures, existing surveys or association approvals needed and guide you through those items.
For commercial and shared multifamily properties within Batavia municipal limits. “Confirm scope” means the cited guidance does not establish an exemption.
| Work planned | Permit or review requirement | What we prepare with you |
|---|---|---|
| Asphalt patching and pothole repair | The cited grading rules do not establish an asphalt-patch permit exemption. [1] [2] | Show repair depths and whether soil grades will change. |
| Milling, resurfacing and full repaving | Grading on a lot of at least one-quarter acre can require a grading permit when not covered by an approved plan; stormwater areas have additional triggers. [1] | Identify disturbance and any existing approved grading plan. |
| Concrete, curbs and sidewalks | Include concrete-related grading in that review and confirm the sidewalk/curb permit route. [1] [2] | Distinguish panel replacement from changes in elevations. |
| Sealcoating and existing striping | A sealcoat or unchanged-restripe exemption is not established in the linked guidance. [2] | Describe the surface-only scope to City building staff. |
| Changed commercial or multifamily parking layout | If a revised lot changes grading or drainage, resolve the grading approval alongside the layout. [1] | Show existing/proposed elevations and drainage facilities. |
Before pricing the work
For work requiring a grading permit, Batavia calls for engineering information and a completed-site topographic survey. Budget the survey and drainage design into project preparation rather than discovering them after pavement removal.
Official permit guidance
Official guidance checked September 15, 2026. Requirements depend on the property and final scope; confirm the applicable approvals before work starts.
Frequently Asked Questions
What should a commercial paving proposal in Batavia define?
It should define existing-condition findings, treatment boundaries, depth and material assumptions, access, closures, temporary routes, connected drainage or concrete work, final markings, exclusions and reopening conditions.
Can the property remain open during the work?
That depends on entrances, available staging, deliveries, emergency and accessible routes, curing or cooling time and the amount of pavement that can close safely. The proposal should include a site-specific phase plan rather than a generic promise.
Get a Free Batavia Estimate
Use the form to describe the property, pavement condition, access requirements and requested work.